博德新能股份有限公司
Update:2026/11/10
Industries
Main Industry
Energy
Main Product/Service
Renewable energy investment and development, construction, operations and maintenance (O&M), and energy storage equipment deployment.
The content above was translated by Ai
Founded Year
2023
Unified Business No.
93776935
Status
Active
Number of Employees
0
Total Paid-in
Capital
50,000,000 (NT$)
Location of Company
Taiwan
, Taipei City
Website
Company names, registration status, legal representatives, founding years, paid-in capital, registered addresses, and other details are sourced from business registration records maintained by Taiwan’s Administration of Commerce, Ministry of Economic Affairs. Exit status includes Emerging Stock Board listings, M&A, and IPOs. Information on overseas expansion is self-reported by startups.
Note 1: FINDIT compiles company information from public and other sources for reference and does not serve as a point of contact for the companies listed.
Note 2: Some company profiles and product/service descriptions are translated using AI and provided for reference only. In case of discrepancies or ambiguity, the original text prevails.
Exclusive content for members
Members-only content. Please log in to access.
About the Company
博德新能股份有限公司 (hereinafter referred to as 博德新能) takes sustainable development, net-zero carbon emissions, and green renewable energy as its core values, and aims for low-carbon and energy transition to systematically carry out the investment, development, construction, operation, and maintenance of renewable energy; conducts evaluation and procurement through green trading platforms; and furthermore, plans for the construction of energy storage equipment to enhance grid resilience benefits and safety, comprehensively launching the green transition train to achieve the corporate goal of 100% renewable energy use.
In 2023, 博德新能 planned to invest 69 million to construct a 1.5MW solar power plant. It is expected to generate an average of 1,739,113 kWh of green electricity annually, which is equivalent to an average annual carbon reduction of 860.86 tons, equal to planting 956 trees or approximately 78.98 hectares of forest land. The total capacity over 20 years is 17,217.22 tons, equivalent to 44.55 Da'an Forest Parks, producing an average of 1,739 green certificates per year. In the next phase, it is expected to conduct the evaluation, investment, development, and construction of 10MW of renewable energy. The green transition train is expected to grow exponentially, accelerating the ultimate goal of 100% renewable energy use by the enterprise.
In 2023, 博德新能 planned to invest 69 million to construct a 1.5MW solar power plant. It is expected to generate an average of 1,739,113 kWh of green electricity annually, which is equivalent to an average annual carbon reduction of 860.86 tons, equal to planting 956 trees or approximately 78.98 hectares of forest land. The total capacity over 20 years is 17,217.22 tons, equivalent to 44.55 Da'an Forest Parks, producing an average of 1,739 green certificates per year. In the next phase, it is expected to conduct the evaluation, investment, development, and construction of 10MW of renewable energy. The green transition train is expected to grow exponentially, accelerating the ultimate goal of 100% renewable energy use by the enterprise.
The content above was translated by Ai